House renovation in London, from the survey that finds what sits behind the plaster
through to handover, built under one contract

Follow us -

Get a Free Quote

Tell us about your project and we’ll get back to you shortly.

    House Renovation London

    London houses were built before most of the things they now contain. The terraces that fill the capital went up without wiring, without plumbing upstairs, and without any insulation at all. There was no central heating and no bathroom. Everything you use daily was added later, usually more than once, and often by whoever was cheapest at the time.

    How recent that work is tends to surprise people. A national survey in 1967 found 15.7 million homes in England and Wales, 40 per cent of them built before 1919. A quarter still lacked a basic amenity — a bath, a wash hand basin or hot water. Nearly one in five had no indoor toilet. Those houses are now the ones being renovated.

    So a house renovation in London is rarely about decoration. It’s about undoing fifty or a hundred years of patching, then putting the services, the structure and the plan back in one go. Strip the plaster off a Victorian terrace and you find the history of everyone who has owned it: a rewire from the 1970s, pipework from the 1990s, a wall moved for a conversion that nobody kept a drawing of. None of that is visible on the day you buy the house. All of it decides what the work costs.

    Renovations here usually start for one of three reasons, and they lead to different jobs. Somebody has just bought a period house and wants it sorted before moving in, which gives the widest scope and the shortest window. Or the services have reached the end of their life together, so the wiring, the boiler and the pipework all need replacing at once. Or the plan simply no longer suits the household, and the rooms need rearranging rather than renewing. Knowing which of the three you are in decides the sequence, the budget and whether you can stay in the house.

    Design And Build is an architect-led design and build company working across Greater London. Architects, structural engineers, party wall surveyors and our own trades sit inside one business and one contract, from the first survey through to handover.

    Long kitchen running from the original front door of a renovated period house
    Renovated bathroom with a sash window, a freestanding bath and a walk-in shower

    What a Renovation Actually Needs Permission For

    Most people believe a house refurbishment in London needs no permissions at all, because nothing is being added to the outside. That belief is wrong, and it’s expensive. Planning permission usually isn’t the issue here. Three other consents are, and all three bite on work that never leaves the inside of the house.

    If the property is a flat, the position changes again. You will almost certainly need a licence to alter from the freeholder, on top of everything below.

    Building Regulations: Rewiring, Replumbing, Windows and Structural Openings

    Building regulations apply to the work, whether or not planning permission does. Electrical work in a dwelling is covered by Part P. Drainage and sanitation fall under Parts G and H, insulation under Part L, ventilation under Part F, and structure under Part A. Replacement windows have to meet the current standard, not the one they were made to.

    Two things follow from that. Someone has to notify the work and certify it. And when you sell, the buyer’s solicitor will ask for those certificates. Work done without them isn’t just a technical problem. It’s a problem on the day you move.

    Party Wall Notices for Work Inside Your Own House

    A party wall notice is not only for extensions. The Party Wall etc. Act 1996 covers cutting into a party wall, removing a chimney breast, and inserting a beam into a shared wall. All of that is internal work. In a London terrace the party wall runs down both sides of your house, so two sets of neighbours may need notice for a job that never leaves your own front door.

    Serve the notice properly and the process is routine. Skip it and an adjoining owner can stop the work, which on a renovation means stopping everything, because the trades are all on site together. Our party wall surveyors identify the owners, serve the notices and agree the award.

    Listed Buildings, Where Consent Reaches the Inside

    Listing protects the whole building, not the front of it. In a listed house, consent is needed for internal alterations as much as external ones — moving a wall, replacing a staircase, taking out a fireplace, sometimes even changing the finishes. The designation doesn’t stop at the front door. Unauthorised work to a listed building is a criminal offence, not a planning breach, and that is a distinction worth understanding before anyone lifts a floorboard.

    Period front room with sash windows, timber shutters and an oak floor

    Renovating a Victorian or Edwardian House

    A Victorian house renovation in London is largely a question of materials. These houses were built from solid brick laid in lime mortar, with no cavity and no damp proof course as you would now understand one. They were designed to take in moisture and let it out again. Treat them as modern buildings and they fail. That one misunderstanding causes more damage to London houses than anything else.

    Solid Brick, Lime Mortar and Why the Walls Have to Breathe

    A solid wall has no cavity to stop water. It relies on evaporation instead. Lime mortar is softer than the brick around it, so it moves, and it lets moisture pass. Cement does neither. Repoint a Victorian wall in cement and the moisture leaves through the face of the brick instead. That’s why old houses shed their brick faces after a hard winter.

    The same applies to paint, render and insulation. Anything that seals the outside of a solid wall traps water inside it. The rule is simple enough. Lime goes back where lime came out.

    Damp, and the Three Things That Usually Cause It

    Damp in a London house is usually a symptom, not a disease. Three causes account for most of it. The wall has been sealed with the wrong material. The ground level outside has risen above the floor level inside, often through a path or patio laid over the old one. Or the rainwater goods are leaking, and have been for years.

    Injected chemical treatment deals with none of those. Finding which of the three you’ve got is cheaper than treating all three, and it’s part of the survey.

    Sash Windows, Floors and What Is Worth Repairing

    Repairing a sash window almost always costs less than replacing it, and it keeps the detail that makes the front of the house work. A new timber box with slim double glazing is the right answer only where the original is beyond saving. Original floorboards, cornice runs and staircases are usually worth keeping for the same reason: replacing them costs more and returns less.

    Open-plan ground floor with a cantilevered steel and oak staircase

    What a Whole-House Project Covers, and in What Order

    A full house refurbishment in London runs in a fixed sequence, and the sequence is what keeps the price down. Do the stages out of order and you pay twice to reach the same joists.

    Stripping Out, and What the House Tells You Once It Is Open

    The job starts by taking out everything added since the house was built. Partitions, boxed-in pipework, failed plaster, old wiring. This is the stage that changes budgets, because it is the first time anyone can see what is actually there. Expect a conversation at the end of it. A good contractor plans for that conversation instead of pretending it won’t happen.

    First Fix: Wiring, Pipework, Heating and Insulation

    With the house open, the services go in together. New wiring, new pipework, the heating system, and insulation where the construction allows it. Our structural engineers size any beams at this stage, because structural openings are cheapest while the floors are already up. Everything that will be buried in a wall happens now.

    Second Fix and Finishes, and Where Interior Design Belongs

    Second fix is sockets, switches, radiators, doors, sanitaryware and kitchens. The decisions behind it were made months earlier. That’s the point many renovations get wrong. Our interior designers work alongside the architects while partitions can still move, so ceiling heights, lighting, joinery and floor levels are settled as one design rather than chosen late from a showroom.

    Home Renovation London: Living In It, or Moving Out

    You will be asked this early, and the honest answer depends on scope. A whole-house project with the services out is not habitable for the middle of the programme. A phased job lets you stay, but takes longer overall and costs more, because the site is set up and broken down more than once. Decide it at the start. Changing your mind halfway is the most expensive version of both options.

    What the Survey Has to Find Before Anyone Can Price a House Renovation

    House renovation cost in London can’t be given as a rate. Anyone quoting one before seeing the house is guessing. An extension is priced on new work of a known size, while a renovation is priced on what is already there — and most of that is hidden behind plaster, under floors and inside walls.

    The Five Unknowns Behind the Plaster

    01

    The services. Whether the wiring and pipework can be reused anywhere, or whether all of it goes.

    02

    The structure. Which walls carry load, what the floors are sitting on, and whether anyone has removed something they should not have.

    03

    The damp. What is causing it, and whether the ground outside has to be dug down.

    04

    The fabric. Whether the walls have been sealed in cement, and how much has to be taken back to lime.

    05

    The consents. Whether the house is listed, whether a party wall notice is needed, and what has to be certificated.

    All five can be established in a survey, and the survey is free. None of them can be established from a photograph or a phone call, which is why a figure given over the phone tells you nothing except that somebody wanted the job.

    What a Renovation Quote Should Already Include

    Ask whether these are in the figure or outside it: the survey and drawings, the structural calculations, building control, the party wall notices and any award, scaffolding, skips and parking suspensions, making good between trades, and the VAT treatment. A price missing half of that list isn’t cheaper. It’s shorter.

    Renovated kitchen with a white island, dark cabinetry and pendant lights

    Property Refurbishment in London: Landlords, Investors and Flats Above Shops

    Property refurbishment in London is a different job from renovating the house you live in, because the deadline is a tenancy or a sale rather than a move-in date. The work is judged on what it returns, not on how it feels to live in. We take on property renovation in London for landlords and investors, and we work on mixed use buildings — flats sitting above a commercial ground floor. We don’t do office or retail fit-out.

    Home Refurbishment Between Tenancies and to Letting Standard

    A home refurbishment in London between tenancies has a fixed window, and the window is usually short. That’s when the kitchen and bathroom get replaced, the property gets rewired, fire doors and alarms go in and the damp repairs happen. We plan the programme around the void period and around whatever the licence conditions require, so the property is ready to let on the day the work ends. Gas and electrical certificates come from our own team. That removes the usual wait for somebody else to issue them.

    Licensing varies by borough and by ward. Several London councils now licence every private let inside defined areas. The local pages below set out what applies where.

    What Changes When the Ground Floor Is Commercial

    A flat above a shop is where refurbishment gets genuinely technical. Fire separation between the commercial unit and the flat is a building control matter. It decides the construction of the floor, the ceiling and the staircase. Sound separation is treated the same way. Access is usually up one staircase. Working hours often depend on the business trading below, and the lease will tell you more about what you can touch than the planning system does.

    Lower ground floor with a rooflight and sliding glass doors to the garden

    Choosing a Refurbishment Company You Will Be Living With

    A refurbishment company in London will be in your house for months, not weeks, and a renovation company in London is the same thing under another name. That makes it a different decision from picking a trade. You’re choosing the people who hold your keys, who are there when you leave for work, and who decide what happens when something unexpected turns up behind a wall.

    Employed Trades, and Who Is in Your House Each Morning

    Ask how many of the people on site are employed by the company. Many firms carry a small core and hire the rest in weekly, trade by trade. We employ our own trades and use no subcontractors. The same faces are there from the first day to the last, the programme doesn’t stall because somebody took a better-paid week elsewhere, and one company is answerable when something is wrong.

    Gas, Electrical and the Certificates That Sign the Job Off

    Gas and electrical work is done in house and certificated in house, so your paperwork doesn’t depend on a third party turning up. We are NICEIC Approved Contractors and on the Gas Safe Register, registered with TrustMark through NAPIT, and members of the Federation of Master Builders. On a renovation those certificates matter more than on most jobs, because almost everything behind the plaster is notifiable.

    House Renovation Across Every London Borough

    A house renovation London project is shaped by the borough as well as the building. Whether the house is listed, what the conservation area covers, and how the council handles certificates all vary across the capital. Start with the region covering your address: north London, north west London, west London, east London, south east London and south west London. Each links on to the individual areas beneath it.

    Where the work adds floor area rather than renewing it, the house extension page covers what the boroughs allow. Drawings, applications and consents are prepared by our architects, and the whole job is built by one construction company under a single agreement.

    Send the address and tell us what you are planning. Back comes the consent position, a list of what has to be certificated, a scope set out line by line and a price fixed to it.